1-800-424-6128

Aftermarket Hot Water Distribution Basins | Cyrco, inc.

Custom Metal Fabricated Replacement Hot Water Distribution Basins (Pans) that are Compatible with Any Cooling Tower and at Significantly Lower Costs than OEM Manufacturer's Parts.

Cyrco Aftermarket Hot Water Distribution Basin Energy Plant  Cyrco Aftermarket Hot Water Distribution Basin Pan  Cyrco Aftermarket Hot Water Distribution Basin Stainless Steel

Cyrco Aftermarket Hot Water Distribution Basin Inlet Valve   Cyrco Aftermarket Hot Water Distribution Basin Cooling Tower Nozzle  Cyrco Aftermarket Water Distribution Basin at Energy Power Plant


USA made steel metals, fabrication, cooling tower parts usa flag in states icon


Cyrco, inc. custom metal fabricates aftermarket replacement hot water distribution basins that are compatible with any field erected (FEP) or factory assembled (FAP) metal cooling tower, no matter the year of construction. Rusted and metal-degraded basins that leak, or spray nozzles that are clogged and broken, all lead to the incoming hot water from being unevenly distributed to the fill media below. In many cases, these faults cause the hot water to improperly funnel in concentration to one section of the fill media, or run down the tower's side walls, all together completely bypassing the intended fill media below. When the hot water is not distributed evenly through the fill media, which purpose is to finely disperse the hot water droplets through layers of cells and membranes in order to rapidly cool the water, the cooling tower instantly degenerates in energy efficiency. Hot water distribution basins are the first, and an extremely vital component, for a properly functioning cooling tower.

Features:

  • Metal fabricated from heavy 14 gauge, quality, USA made steels (many other aftermarket / OEM parts are 23% thinner 16 gauge)
    • G235 Galvanized Steel, or
    • 304 or 316L Stainless Steel
  • Full package hardware kit included: new basin covers, inlet gaskets, assembly fasteners, spiral target nozzles, necessary sealants, and instructional drawings
  • Rapid 7 to 14 day average turn-around times
  • Significantly lower prices than OEM manufacturer replacement parts
  • Includes basin cover door panels to block sunlight and prevent algae growth
  • Basin cover door panels securely fasten in place for storm and hurricane damage protection
  • Easy to install, drop-in replacements built to or above manufacturer-spec
  • Custom fabrication for compatibility with any manufacturer's cooling tower make and model, no mater the year of construction

 

All metal aftermarket parts fabricated by Cyrco, inc. are made from quality, USA made steel, further assuring longevity and the finest of craftsmanship. Cyrco, inc. consistently maintains one of the most rapid, if not the quickest, turn around times in the cooling tower parts supply industry. Typically our replacement aftermarket hot water distribution basins ship within 7 to 14 days after order. Topped with prices well below OEM manufacturer's replacement parts, our aftermarket hot water distribution basins are one of the best investments one can make for maintaining a properly functioning, energy-efficient, cooling tower.

*Buy one, or buy in bulk at discounted prices; retailer and wholesaler pricing also available.


 

Cyrco's custom metal fabrication capabilities, enables us to offer aftermarket parts for older, obsolete cooling towers that no longer have replacement parts available. A client does not have to completely replace a functional cooling tower with a brand new, expensive cooling tower, just because of one or more faulty components. Our partial or complete rebuild of metal factory assembled cooling towers services often save our clients tens of thousands of dollars, or more.

 


Cycro warehouses a wide range of in demand Cooling Tower Parts, especially for expedited shipping during emergency repair service. Experienced personnel are also readily available for immediate dispatch. We help our clients overcome any type of production down-time, whether it be a mechanical failure, structural collapse, hurricane or other form of storm damage. Our reputation is known for our ability to get our clients quickly back into operation.


 

RELATED PRODUCTS:

 

Custom Metal Fabricated Aftermarket Cold Water Basins Cyrco Non-Clogging Spray Nozzle for Cooling Towers - Simple, One-Piece, Snag-Free Design Splash Fill and Film Fill Repacks and Repairs for Both Field Erected and Metal Factory Assembled Cooling Towers

 


 

Cyrco replacement hot water basins cooling towers

REQUEST QUOTE
  • Affiliates:
  • CTI
  • ISN
  • NFPA
  • MICCS
  • Avetta
  • NCRWA
  • Mid Atlantic Safety Council